Biogas installation 26, Putten NL

The construction of the AD-facility in Putten began in 2009 and it was commissioned In 2010. Special feature of this AD-facility is the recovery of excess heat produced by the CHP at a local swimmingpool (3.5 km).

Digester ø21x6 m
Second-stage digester ø31x6 m
Feeding system - 30 m³
Total capacity - 690 kWe